card

Plant Information

  • From 1978 to 2004, Erdenet Mining Corporation dumped low-grade mixed ore that was not suitable for its flotation process resulting in dump No.2.

  • “Achit-Ikht” LLC entered into a Cooperation Agreement with Erdenet Mining Corporation in 2010 to build a Plant using low-grade mixed ore from dump No.2.

  • During the construction of the Plant, the Feasibility Study was developed 4 times, and it was approved by the Mineral Resources Professional Council in 2014.

Хүсэлт илгээх